Trevorharris.xyz

Refresh pending.

Timing · Apr 29 snapshot

Archived Apr 29 readout. Waiting on the next handoff before treating anything as current.

Libra Moon lifts presentation; Moon opposite Mars cautions patience at 10:23 AM. Full Moon Scorpio lands on natal Mars in the 2nd in two days, so close AR and avoid sloppy commitments.

Archived action timing

Apr 29 windows

archived cues

Before noon

Send MKA survey follow-up

Cleanest execution window before travel friction builds.

Mid-morning

Stay patient on road

Moon opposite Mars at 10:23 AM; do not let irritation set tone.

Apr 29 PM

Dominion LOA follow-up

Venus in Gemini favored direct conversation and in-person warmth.

Apr 29 night

Close books

Archived money-axis cue from the prior source snapshot.

Carry-forward

ChemPacific code reference

Verify against the fresh handoff before treating as current.

Quick Capture

Shortcut: Command + Enter. Stored locally in this browser.

Static until next handoff

Archived task snapshot

6 snapshot items
1

Scan tax docs

Admin
2

Respond to masons and power washing companies

Vendors
3

Confirm remaining CCTV feeds

6460 Dobbin

Navy, Air Force, Marine Corps

4

MKA survey follow-up

200 Central

Ship from the road before noon

5

1700 Richmond Hwy LOA

Kristen Klein

Face-to-face or phone while in Richmond

6

Books closed tonight

Finance

AR pass before Full Moon Scorpio

Quiet list

Later

compressed

Invoices

CR · FB · EAST

120 Hay Road RFP

Blue Rock / ECP

Send MCA SOW

CCI

Send Sterling Star plans

PG HVAC

Turn on water

66 Le Way

Amex bank statements

Admin

Natal

Chart operating system

June 18, 1984 · 1:51 PM · Washington, DC

Sun

Gemini 27°39′

9th house

Ideas, expansion, higher learning

Moon

Aquarius 27°45′

5th house

Creativity, invention, pattern-breaking

Rising

Libra 6°21′

1st house

Balance, aesthetics, relationship first

Mars

Scorpio 11°02′

2nd house

Money, endurance, intensity applied to resources

Placement strip

Mercury

9th

Gemini · 14°22′

Venus

10th

Cancer · 2°18′

Jupiter

3rd

Capricorn · 0°45′ R

Saturn

2nd

Scorpio · 14°38′ R

Uranus

3rd

Sagittarius · 11°52′ R

Neptune

3rd

Capricorn · 0°29′ R

Pluto

2nd

Scorpio · 0°59′ R

N. Node

8th

Taurus · 6°20′ R

Signature aspects

Mars + Saturn in Scorpio / 2nd

Wealth has gravity. Build slowly, verify numbers, and let pressure create discipline instead of urgency.

Sun in Gemini / 9th

Expansion comes through learning, publishing, travel, teaching, and the bigger strategic frame.

North Node Taurus / 8th

The path is patient shared-resource mastery: capital partners, debt, taxes, insurance, and trust.

House axes

Money axis

2nd / 8th

Own the numbers, close loops, and manage other people’s money with patience.

Expansion

9th

Study, travel, publishing, and Ireland-aligned long-range vision feed identity.

Presence

1st / Libra

Lead with taste, diplomacy, and calm rooms before hard asks.

Refresh system

Daily update pipeline

runs after 4:55 AM handoff

Operating rule

This page is a daily-refreshed command center. The visible timing/task layer is archived Apr 29 source data and must not be treated as the current-day plan until the next Perplexity handoff is available. Morning updates must reread the handoff, pull the latest digest, refresh financials, refresh todos, refresh timing/context, verify source labels, and only then update the site.

Perplexity handoff

Pending folder link

Daily · expected 4:55 AM

Email scan, new tasks, priority changes

Financial workbook

Connected

Daily · after handoff

Attabuild-Financial-Tracker-FINAL.xlsx via Google Drive

Master Tracker todos

Needs connector/source

Daily · source of truth

Move current static todos into live sheet or database

Blueprint timing

Static until refreshed

Daily · morning

Transits, best-action windows, quote, training, rituals

Quality gate

Required

Every run

Reread handoff, verify sources, validate schema, then update site

Full list

More to do

static snapshot · move to live source next
HIGH

120 Hay Rd

Blue Rock budget / JPMorgan partner transition

Review updated budget, confirm surcharge options, and keep Drew/David looped in.

HIGH

6200 Seaforth

Cost estimates

Follow up on docks, site work, and HVAC hard-cost numbers for Drew.

HIGH

200 Central

Fence scope

Get images/cut sheets and height from Dale; close out permit comments.

HIGH

CBC Armed Forces

ACOE signature

Get Bob Bergin signature and forward completed document to Mackenzie.

HIGH

6200 Seaforth

Demo SOW

Assemble Seaforth demo scope of work for Drew.

HIGH

200 Central

Display setback

Research display setback requirements and report back to Peter/team.

HIGH

ChemPacific

Hazmat code reference

Obtain code reference for allowable wood shelving in storage room.

MED

Station Road

Vet Fire

Confirm Andrew Lambert visit happened or reschedule sprinkler inspection.

MED

MCA

Plan + distribution

Formulate MCA plan and distribute.

MED

Cedar Lane

Pricing packages

Distribute Cedar Lane / Sterling Star pricing packages.

MED

200 Central

ADA + loading ramps

Send prefab ADA ramp and truck loading ramp cut sheets to Bruce and Brian.

MED

200 Central

Site plan language

Revise site plan language to maintenance only; remove grading references.

MED

200 Central

Permit set

Deliver floor plans, elevations, MEP, ADA ramp, storefront package.

MED

1700 Richmond Hwy

Dominion LOA

Follow up with Kristen Klein for signed Dominion LOA.

MED

2208 Station Rd

Dominion LOA

Follow up with Kristen Klein for signed Dominion LOA.

LOW

Station Rd

Pressure wash quotes

Collect and review Power Wash This, Johnson, and Envirowash quotes.

Money

Financial tracker

Google Drive XLSX · Apr 29

Source note

These values now come from the provided Google Drive workbook, Attabuild-Financial-Tracker-FINAL.xlsx. It is an Excel file with Cash Flow and Summary sheets, not a native Google Sheet. May–December already contain entries, so full-year numbers may include planned/projected items.

Tracker balance

$201,825

Summary sheet running balance after December entries

April subtotal

$4,294

Summary sheet monthly subtotal

Through April

$24,150

Running balance through April

Best month

October

$47,059 subtotal

Workbook

2 sheets

Cash Flow + Summary

Last modified

Apr 29

Google Drive file metadata

MonthSubtotalRunning
Jan$11,150$11,150
Feb$8,645$19,795
Mar$61$19,856
Apr$4,294$24,150
May$42,977$67,127
Jun$9,960$77,087
Jul$14,943$92,030
Aug$19,993$112,023
Sep$35,276$147,299
Oct$47,059$194,358
Nov$9,842$204,200
Dec-$2,375$201,825

Finance alerts

What needs attention

Source verified

Drive XLSX

Attabuild-Financial-Tracker-FINAL.xlsx downloaded through authorized Google Drive access.

Caution

Future months included

Summary contains May–December entries; treat full-year balance as tracker/projected unless confirmed.

To-do source

Static for now

Displayed to-dos live in Home.tsx arrays; quick notes and routine completions live in this browser only.

Capital plan

Savings buckets

Year 1 target allocation · $399k

Tax Reserves

$125k

$10.4k/mo

First priority

Retirement

$69k

$5.5k/mo

Annual max

Emergency Fund

$75k

$3.0k/mo

End 2026

Business Reserve

$75k

$4.2k/mo

Working capital

DC Office

$125k

$5.2k/mo

End 2027

Ireland Fund

$200k

$2.0k/mo

Mid 2029

Flip Seed Capital

$150k

$3.0k/mo

Mid 2027

LEED / BREEAM

$5k

$167/mo

Credential path

Empire

Master plan

Phase 1

Foundation

Now–End 2027

Scale Attabuild, accumulate $200k+ capital, LEED study, first flip, partner/operator search.

Phase 2

Wealth Building

2027–Mid 2029

More flips/BRRRR, EC renovation, BREEAM, Irish business case, partner/operator onboarded.

Phase 3

Ireland Transition

Mid 2029–2030

STEP visa, move to County Mayo, remote Attabuild operations, Green Construction Intelligence platform.

Phase 4

Residency Arc

2030+

Irish residency continuity, citizenship path, portfolio stabilization, transatlantic operating rhythm.

Health

Labs watchlist

Lipids

P1

Retest lipids + ApoB + Lp(a); LDL rose 93→142 in prior data.

Kidney / inflammation

P2

Add HbA1c, fasting insulin, hs-CRP, ferritin, cystatin C.

Hormones

P2

Sensitive E2, free T, DHT, prolactin, IGF-1 for next lab panel.

Sleep

P4

Screen for sleep apnea; HCT has trended high enough to watch.

Next draw

Jul 15

Prep window starts July 8.

Review

End-of-day prompts

1

What did I finish today that actually moved money, health, family, or the Ireland plan forward?

2

What is waiting on someone else, and who gets the next follow-up?

3

What should be moved out of my head and into the system before bed?

4

What can I remove tomorrow so the top of the day stays clean?

Projects

Just enough context

200 Central

Survey, site plan, display setback

120 Hay

RFP and market feedback

Seaforth

ChemPacific code + SOW

Station / 1700

Dominion LOAs + quotes

Trevorharris.xyz

Command center; no service worker